B&B Hotel Idar-Oberstein

We are pleased to announce the successful completion of the new building of a modern B&B hotel in Idar-Oberstein. This project represents a significant contribution to the region's tourist infrastructure and offers guests comfortable and welcoming accommodation. As part of the construction project, we carried out a variety of demanding works, which form the basis for the quality and durability of the hotel.
Location
55743 Idar-Oberstein
trade
Shell & plaster
Construction period
2023-2024
Land use
640qm

Project details

Our most important services included:

- Reinforced concrete reinforcement: We used 70 m³ reinforced concrete reinforcement in concrete class C25/30 to ensure the structural integrity of the building.

- Floor plate: The creation of a sturdy floor plate with an area of 640 m² was another important step that formed the basis for the entire building.

- Reinforced concrete walls: For the walls of the hotel, we used 785 m² of reinforced concrete elements, which not only offer high stability but also enable quick and efficient construction.

- Masonry: We have built a total of 1,430 m² of KS masonry with a thickness of 20 cm and 320 m² with a thickness of 24 cm to ensure optimal thermal insulation and sound insulation.

- Reinforced concrete ceilings: The hotel's ceilings were constructed with 3,240 m² of reinforced concrete in class C20/25, which ensures high load-bearing capacity and safety.

- Mild steel meshes and round steel: A total of 90 tons of structural steel meshes and 70 tons of round steel were used to support the stability and durability of the structure.

‍

We are proud to have made a significant contribution to this project with our expertise and experience.

The newly built B&B hotel will not only offer guests a pleasant stay, but will also contribute to the economic development of the Idar-Oberstein region.

We would like to thank everyone involved for the excellent cooperation and look forward to future projects that we can implement together.

Construction volume
1,500,000,00€
Project type
Neubau
Project management
construction
building technology
energy standards
main materials
Beton & Putz
Façade material
architects
Berndt planning office
engineers
subcontractors
Sto
photography
soonteam cc / René Nolte